Mineral exploration is research work with minimal and temporary environmental impacts

Environmental Footprint of Exploration Activities

Mineral exploration activities comprise geophysical surveys, boulder prospecting and diamond drilling. Geophysical surveys are non-invasive and leave no visible traces on the ground. In September 2025, airborne geophysical surveys in the project area were carried out using unmanned aerial vehicles (UAVs), minimising the need for ground access and reducing disturbance to the surrounding environment.

Drilling is the only exploration activity that causes visible, localised disturbance to the terrain. In 2024, a total of seven diamond drill holes were completed in the area, representing 1,670 metres of drilling. Each drill site occupies only a few hundred square metres, and site locations are carefully selected to minimise vegetation clearance and tree removal.

All drilling equipment is transported to and from the site, and no permanent infrastructure is required. Once drilling activities are completed, the equipment is removed, leaving no permanent structures behind.

Rehabilitation

Drill sites are rehabilitated upon completion of exploration activities. Drill holes are securely sealed with removable plugs. Any damage to standing timber or forest roads resulting from exploration activities is fully compensated to the landowner, separately from the annual mineral exploration compensation payable under the exploration permit terms.

Permits and Supervision

Exploration activities in Finland are governed by the Finnish Mining Act (621/2011), with the Finnish Safety and Chemicals Agency (Tukes) serving as the permitting and supervisory authority. The exploration permit defines the scope and conditions of activities permitted within the designated area, and Tukes is responsible for monitoring compliance with the permit conditions.

An exploration permit does not grant the right to exploit a mineral deposit. Any subsequent mining operation would require a separate mining permit, an environmental permit and an Environmental Impact Assessment (EIA) procedure.

In the ongoing ERDF-funded project, one of the four work packages is specifically dedicated to stakeholder engagement, with the aim of maintaining and strengthening the project’s social licence to operate (SLO).

Kysyttävää ympäristöasioista?

Vastaamme alueen asukkaiden ja maanomistajien kysymyksiin henkilökohtaisesti.