Project timeline

Exploration and project development takes time. Here is our story.

All started in 2020

  1. 2020

    The studies begin

    Suomen Malmitutkimus Oy commences studies and exploration at Kupukka area, with data compilation, bedrock mapping and petrographic studies. Exploration reservation made.

  2. 2022

    Geophysical ground surveys and beneficiation studies

    Geophysical ground survey lines by the Geological Survey of Finland (GTK). Preliminary beneficiation tests by GTK Mintek from historical drillings.

  3. 2023

    Kupukan Grafiitti Oy founded

    Application for exploration permit is transferred from Suomen Malmitutkimus Oy to Kupukan Grafiitti Oy. Encouraging assay results from old drill cores at Kupukka.

  4. 2024

    Exploration Permit and Drillings

    Exploration permit is granted, more geophysics and first drilling made, 7 holes totaling 1670 m.

  5. 2025

    Graphite-rich Trend widens

    Assay results from drillings confirm the existence of several kilometers long graphite-rich trend. Drone Magnetic and EM surveys with 3D inversions show continuity and remarkable depth extension. New Exploration Permit application, Kupukka SE.

  6. 2026

    Technical Report and Battery Tests

    The JORC 2012 technical report is completed. The production of spherical graphite is successful, and battery tests yield excellent results. ERDF funding is granted. New Exploration Permit application, Heteneva.