The first phase of drilling at Kupukka completed
Kupukan Grafiiti Oy has completed the first phase of drilling of the Kupukka graphite deposit. Seven holes with a total length of 1,670 meters were drilled in the area. Graphite-bearing gneiss was intersected in all holes, which indicates that the Kupukka deposit is promising in terms of dimensions. Total length of the EM and magnetic anomalies probably indicating the graphite-bearing gneiss is around 10 km (Fig. 1).
Drill cores will be logged in the field base of Kupukan Grafiitti Oy in Rantsila over the next couple of months. Preliminary microscopic studies have already been performed on a few samples, and based on these, the quality of the graphite is good (Fig.2). However, various additional studies are still needed to determine the quality of the graphite more precisely.
